Mine Room
The Hall of Residence

Learn more

Construction &
Fire Protection

The exterior walls consist of a precast timber frame insulated with mineral wool and clad with gypsum fibreboards on both sides. They hardly have any load-bearing function. The external formwork and its substructure were applied in the factory.

Partition walls made from KLH wall elements together with KLH ceiling disks provide horizontal reinforcement. Both the partition walls and the ceilings are equipped with facing formwork to meet technical requirements regarding sound insulation as well as fire prevention. Projecting sheet metal strips on each storey additionally prevent fire spread on the timber façade.

Project Info

Download data sheet

Our 
services.

Learn more

More References

References &
Inspirations

 

Educational Buildings

Glenn Doman School

The symbiosis of sustainable architecture and progressive pedagogy

Single Family Houses

House with forest views

New construction of an old farmhouse

Hotels

Hótel Jökulsárlón

A hotel near the majestic Vatnajökull glacier

Healthcare Buildings

Psychiatry Clinic Ottakring

sustainable architecture with modern healthcare

Public Buildings

Aldi

A fantastic example of modern sustainable retail construction.

Office Buildings

Free City

An office building – efficient and innovative right from the start

Office Buildings

Facephi

from cinemas to state-of-the-art offices

Passive Houses

Lilyfield

A certified Passivhouse Premium

Public Buildings

Tourist office Orelle

tourist office with holiday flat

Refurbishment & Extensions

Raiffeisenbank

Modern architecture in the centre of St. Johann

2019 A+Awards
Jury Winner

Learn more

At your service.

(971) 804-3794
Sebastian.Popp@klhusa.com

KLH US Holding Corp.
1155 SW Morrison St.
Suite #200
Portland, OR 97205

We are there
for you.